Intranet

Intranet - Logowanie

News

Commencing the construction works on the dam in Modzelówka

On 8th January 2018 was signed an agreement on the implementation of a task under the title: “The repair of the dam located in km 0+030 of the Ełk river with its completion by the equipment that enables to moving the floating equipment within the frames of the LIFE13 NAT/PL/000050 project”. These works constitute a part of the large task, which will be implemented in Modzelówka within the frames of the alternation of the whole water junction. A repair of the dam and a reconstruction of the water junction in Modzelówka will be connected with restoring a patency and a partial reconstruction of the Ełk river. An intensification of the works aimed at the long-awaited return of the Ełk river to its old, natural riverbed is more and more noticeable. The works related to the repair of the dam will last for a few months.

  • autor: Małgorzata Stanek, data: 2018-12-10

Photos from Modzelówka

  • -
  • -

Back